Glickenhaus celebrates a prestigious third place in the FIA WEC 1000 Miles of Sebring with the racing program run by Podium

21 March 2022

Sebring, 21 March 2022 – The Glickenhaus 007 LMH No. 708 has placed third overall in a field of 36 cars, reaching the podium behind Alpine Elf and Toyota
 
Despite a penalty and a storm that brought an early halt to the opening round of the FIA WEC season in Sebring, U.S.A., the Glickenhaus 007 LMH No. 708 has placed third overall in a field of 36 cars, reaching the podium behind Alpine Elf and Toyota.

Aboard the Glickenhaus 007 LMH No. 708, designed, developed and built by Podium Advanced Technologies, drivers Pla, Dumas, and Briscoe have also obtained the second est lap time: 1:49.888.

With a total time of 7:15:37.293, 193 laps completed and a gap of only one from the winner, this is a truly astonishing result for the premiere in the U.S.A. of the FIA World Endurance Championship, both for Glickenhaus Racing and Podium, which has run motorsport programs for the American team since 2015.

The 1000 Miles of Sebring was called to a premature halt after 194 laps of the 6.019km (3.74-mile) circuit with 70 minutes remaining due to the hazard posed by an oncoming thunderstorm of epic proportions.

The 36-strong WEC field will regroup in Belgium for the second round of the championship, the Total Energies 6 Hours of Spa-Francorchamps, on May 5-7.

Luca Ciancetti, Glickenhaus Racing Team Principle and Podium Advanced Technologies Head of Road Cars and Motorsport: “ We all are extremely satisfied for being on the podium for the first time. The 007 LMH project, which started only in 2019, led us to conquer 4th and 5th places overall at legendary Le Mans 24 Hours in 2021. Our company has really been a pioneer: with the exception of Toyota, we have been the first to design a hypercar from scratch in the LMH category, now at its second season. We are deeply grateful for the opportunity to work with a manufacturer as Glickenhaus and with Jim himself: a real car passionate with a huge knowledge on car development: his inputs are always focused, his approach constructive and his support to the team always valuable. We are looking forward to racing in Spa-Francorchamps with the same strong team spirit we built together.”

Share on twitter
Share on linkedin
Share on email
Share on whatsapp

Assembly process

Sorting, Testing and Stacking Cylindrical
- Fully automated station
- 100% cells state of health testing (including open circuit voltage, resistance/AC impedance, temperature
- Stations able to handle module up to 1200 mm length
- Different cooling strategies can be handled within this station
- Similar capacity cells can be sorted and included in a module
- Fast and tack-free led lamp curing
- Accurate pressing operation
Sorting, Testing and Stacking Cylindrical
Sorting, Testing and Stacking Prismatic and Pouch
- Fully automated station
- 100% cells state of health testing (including open circuit voltage, resistance/AC impedance, temperature
- Stations can handle different cell dimensions and different thermal extraction strategies
- Accurate pressing operation
Sorting, Testing and Stacking Prismatic and Pouch
Bus Bar Laser Welding
- Cutting edge laser beam technology that guarantees robust joints for several type of busbar connections
- Possibility to weld challenging reflective materials such as CU, Al and dissimiral combination of materials
- Internal development of welding parameters
- Extensive quality control such as weld penetration in process monitoring and resistivity checks
- Stations can handle module up to 1200 mm length and 600 mm width
Bus Bar Laser Welding
Ultrasonic wire bonding
- Fully automatic station
- Wire bonding with the highest axis accuracy
- Continuous real time monitoring of wire condition and process
- Integrated quality control
Ultrasonic wire bonding
Pack assembly stations
- Stations equipped with manual assistors and process dedicated tools to allow assembly teams to work in perfect ergonomic and safe conditions
- Stations equipped with torque monitored tools
- Control tracking system to verify process completion and quality monitoring
- Junction box assembly and quality control
- Controlled sealing application completed after functional test
Pack assembly stations
EOL Testing
- Battery module and pack functional tests
- BMS firmware and software flashing
- Pack cooling system integrity test
EOL Testing

Main features

  • Safety: BMS Design compliant for ISO 26262
  • Scalable slave-master architecture, handles systems
    up to 1.000 V
  • Cell dissipative balancing

Functionalities

  • Real time monitoring cells & components voltage
    and temperatures
  • Advanced algorithms for SOC/SOH estimation
  • Advanced SOP estimation with realtime cell
    thermoelectrical models
  • Electromechanical components feedback monitoring
    and degradation estimation (fuses, contactors)
  • Control and monitoring of the thermal management system
  • Sensing of current, water leak, internal humidity, etc
  • Ground fault monitoring of grounded or ungrounded systems

Services related to BMS

  • Testing and modelling of battery cells
    and systems
  • Experimental characterization of cells
    for accurate state estimation algorithms
    (e.g., SOC, SOE, SOH, SOP)
  • BMS hardware and software development
    for specific applications
  • Prototyping of high-performance
    battery systems
  • Consulting in the field of battery systems

Fill the form and upload your CV